The following fees shall be paid at the time the application is made; all fees will be rounded to the nearest dollar. Any property owner or contractor receiving a "stop work" or "cease and desist" order shall be charged two times all fees charged for the project in violation.
(a) Construction, Alteration, Placement. or Removal.
(1) Single and multiple family dwellings, mobile homes or modular homes- $3.00 per 100 square feet, with a minimum of $50.00.
(2) Detached garages, decks, or outbuildings- $2.00 per hundred square feet with a minimum of $25.00.
(3) Industrial, commercial, retail or educational buildings, $2.50 per hundred square feet with a minimum of $100.00.
(4) For additions or alterations to existing buildings $2.00 per hundred square feet with a minimum of $25.00.
(b) Moving and Demolition of Buildings.
(1) Moving a structure on or across a public thoroughfare- $25.00.
(2) When a police escort is required a $50.00 per hour charge, minimum one hour will be paid. Mobile homes and modular homes are not considered under this section.
(3) Moving a structure of 200 square feet or more from one lot to another without crossing a public thoroughfare - $25.00.
(4) Moving temporary construction shanties- no fee.
(5) Demolitions of buildings of 1,000 square feet or more (including each floor) - $25.00.
(c) Moving and Demolition Deposit.
(1) In addition to a zoning certificate fee a yard grade deposit of $500.00 cash or bond will be required. This deposit pertains to demolitions of buildings of 1,000 square feet or more, including each floor. This deposit will be charged on residential, industrial, commercial, retail, educational demolitions. This deposit to be required on all permits issued under Section 1177.06(b)(1) thru (5).
(2) This deposit is to insure that the property and surrounding work area is left in an orderly condition and free from damage after and during the demolition. It is also to insure that streets and alleys are kept free of mud, stone and other debris. A punch list will be provided with the permit that will be used when a request for the deposit is received.
(3) The deposit will be returned in full if the property is left in satisfactory condition and the Village was not required to clean up after the contractor or sub-contractor. The Village Street Department will be responsible for the final deposit inspection once the property owner, contractor or subcontractor notifies them of completion of the demolition. If deductions are required, they will be charged according to the amount of time and cost of repair or clean up by the Village.
(d) Truck Routing. The Zoning Inspector at the time of issuing the permit will establish a truck route when applicable.
(e) Driveways and Curb Cuts. Anyone installing a new driveway or entrance where cutting a curb is required to obtain a permit. Curb cuts will be made in accordance with specifications on file at the Water and Sewer Office - $25.00.
(f) Additional Inspections, Change of Use. Fences, Propane Tanks. Signs and Miscellaneous.
(1) If additional inspections are required for any permits a fee of $25.00 per inspection will be charged.
(2) All other certificates not previously covered are $25.00.
(3) If a Zoning Certificate is not issued, an administrative fee of $25.00 will be retained and all over $25.00 will be refunded.
(g) Construction Compliance Deposit.
(1) In addition to a zoning certificate a compliance deposit of $1,000.00 cash or bond will be required. This deposit will be charged on all new residential, industrial, commercial, retail and educational construction.
All permits issued under Section 1177.06(a)(1) and (3) are required to pay this deposit.
(2) This deposit is to insure that all construction standards are met, that the property is left neat and clean and no damage was done to Village property. A punch list will be provided with the permit that will be used when a request for the deposit refund is received.
(3) The deposit will be returned in full if all Village standards are complied with, there is no damage to Village property and the Village was not required to clean up after the construction. The Village Street Department will be responsible for the final deposit inspection once the property owner, contractor, or sub-contractor notifies them of completion of construction. If deductions are required, they will be charged according to the amount of time and cost of repair or clean up required by the Village. If all of the Village standards are not complied with at the expiration of the original permit period, or any extension of time given, the bond shall not be returned but shall be forfeited to the Village.
(4) The contractor must supply a complete sub-contractor list with Federal ID numbers. Submission must be within a reasonable time period. If the complete list is not provided, the bond will not be returned but shall be forfeited to the Village. (Ord. 2014-01. Passed 3-18-13.)