1109.02 SUBMISSION FOR APPROVAL OF FINAL PLAT.
   (a)   The Subdivider shall prepare and submit the following:
      (1)   Six (6) copies of the final plat of the proposed subdivision.
      (2)   Three (3) copies of construction drawings related to the improvements to be constructed in the proposed subdivision.
      (3)   Two (2) copies of an itemized engineer’s estimate with quantities for all proposed improvements including the estimate of cost for each item.
      (4)   A copy of the storm sewer and storm detention calculations and other applicable calculations for design.
      (5)   Completed final plat checklist with remarks.
      (6)   Completed final construction plan checklist with remarks (see Design Criteria for list.)
   (b)   All final plats, construction drawings, and supporting documents shall meet all Design Criteria and Construction Standards and Drawings established by the Village, the Zoning Regulations of the Village, or requirements established by other governmental organizations having jurisdiction over the improvements. The most restrictive requirements shall apply.
   (c)   The final plat shall be considered officially filed on the day it is received and properly noted and shall be so dated. However, the final plat shall not be considered properly submitted until all applicable fees are paid by the developer (see Section 1115.04 - Schedule of Fees) and until all plans, supporting documents, and materials are provided to the Village Administrator.