§ 50.079 INSPECTION, MAINTENANCE, RECORD KEEPING AND REPORTING.
   (A)   After the approval of the storm water management permit by the town and the commencement of construction activities, the town has the authority to conduct inspections of the work being done to ensure full compliance with the provisions of this section, the approved storm water pollution prevention plan, the town’s Storm Water Technical Standards Manual and the terms and conditions of the approved permit.
   (B)   Storm water quality facilities shall be maintained in good condition, in accordance with the operation and maintenance procedures and schedules listed in the town’s Storm Water Technical Standards Manual, in addition to the designed and approved performance specifications for the facilities and shall not be subsequently altered, revised or replaced, except as approved by the town.
   (C)   The town also has the authority to perform long-term, post-construction inspection of all public or privately owned storm water quality facilities. The inspection will cover physical conditions, available water quality storage capacity and the operational condition of key facility elements. Noted deficiencies and recommended corrective action will be included in an inspection report.
(Ord. 2013-17, passed 12-2-2013)