§ 50.078 EASEMENT REQUIREMENTS.
   All storm water quality management systems, including detention or retention basins, filter strips, pocket wetlands, in-line filters, infiltration systems, conveyance systems, structures and appurtenances located outside of the right-of-way shall be incorporated into permanent easements. For the purposes of monitoring, inspection and general maintenance activities, adequate easement width, as detailed in the town’s Storm Water Technical Standards Manual, beyond the actual footprint of the storm water quality management facility as well as a 20-foot wide access easement from a public right-of-way to each BMP shall be provided.
(Ord. 2013-17, passed 12-2-2013)