(A) Calculation of land disturbance should follow the guidelines discussed in § 50.042 of this chapter.
(B) The calculation methods as well as the type, sizing and placement of all storm water quality management measures or BMPs shall meet the design criteria, standards and specifications outlined in the town’s Storm Water Technical Standards Manual. The methods and procedures included in the referenced standards is in keeping with the above stated policy and meet the requirements of IDEM’s Rule 13.
(Ord. 2013-17, passed 12-2-2013)