§ 195-10 Post-Construction Component of SWPPP Requirements.
   The post-construction SWPPP shall include the following:
   (A)   A map indicating the location of the existing and proposed buildings, roads, parking areas, utilities, BMPs. The map shall also identify soil type, vegetation cover, and resources protected under other sections of this chapter. This map shall be a normal engineering scale and should be at a scale no smaller than 1"= 100', and no larger than 1"= 10'.
   (B)   Sufficient engineering analysis to show that the proposed BMPs are capable of controlling runoff from the site in compliance with this chapter and as stated in the ECDDM for Maricopa County, Arizona, as amended.
   (C)   For redevelopment, BMPs for controlling existing stormwater runoff discharges from the site.
(Ord. O2007-78, passed 12-19-07)