(A) All new subdivisions proposals and other proposed development (including proposals for manufactured home parks and subdivisions), greater than 50 lots or five acres whichever is lesser, shall:
(1) Identify the Special Flood Hazard Areas and the BFE, and
(2) Identify on the final plans the elevation(s) of the proposed structure(s) and the pads. If the site is filled above the BFE, the final lowest floor and finished grade elevations shall be certified by a registered professional engineer or surveyor and provided to the FPA.
(B) All subdivision proposals and other proposed development shall be consistent with the need to minimize flood damage.
(C) All subdivision proposals and other proposed development shall have public utilities and facilities such as sewer, gas, electrical and water systems located and constructed to minimize flood damage.
(D) All subdivision proposals and other proposed development shall provide adequate drainage to reduce exposure to flood hazards.
(Ord. O2006-53, passed 8-16-06; Ord. O2021-013, passed 7-21-21)