§ 150-046 Amendments.
   The following amendments, additions and deletions are hereby made to the 2018 International Mechanical Code, as adopted by this subchapter. Paragraphs and section numbers refer to the 2018 International Mechanical Code numbering system. Code references not amended in this section shall be enforced as published in the reference document.
   (A)   Section [A] 101.1 Title. These regulations shall be known as the Mechanical Code of the City of Yuma, hereinafter referred to as 'this code'.
   (B)   Create a new sub-section, "[A] 101.2.2 Other Codes. Where a section references the International Fire Code, amend to read 'current adopted fire code'. Where a section references the International Energy Conservation Code, amend to read ‘current adopted energy conservation code.’ Where a section references accessibility provisions, it shall be taken to reference Arizona Revised Statutes, Title 41, Chapter 9, Article 8, Public Accommodations and Services. The Arizonians with Disabilities Act, R10-3-401 through R10-3-404, which includes - 28 CFR 35 and 28 CFR 36 and Americans with Disabilities Act Accessibility Guidelines for Buildings and Facilities (ADAAG)."
   (C)   Section [A] 103.1 General. Amend to read, "The Department of Building Safety is hereby created and the executive official in charge thereof shall be known as the 'building official'." Amend all sections of this code that reference the ' code official ' by replacing to read the 'building official.'
   (D)   Section [A] 106.4.4 Extensions. Delete last two sentences of this section.
   (E)   Section [A] 106.5.1 Work commencing before permit issuance. Any person who commences work on a mechanical system before obtaining the necessary permits shall be subject to the usual permit fee and an additional investigative fee. An investigative fee, in addition to the permit fee, shall be collected whether or not a permit is then or subsequently issued. The investigative fee shall be determined by the building official, based on the circumstances, nature and severity of the infraction. The minimum investigative fee shall be $50 and the maximum shall be an amount up to the same as the fee set forth in Table 1-A.
   (F)   Section [A] 106.5.2 Fee Schedule. Amend by adding Mechanical Permit Fee Table 1-A:
TABLE 1-A: MECHANICAL PERMIT FEES
   Permit issuance and heaters
   1.   For the issuance of each mechanical permit   $50.00
   2.   For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled   $7.00
   Unit Fee Schedule
   (Note: The following do not include permit-issuing fee.)
   1.   Furnaces
   For the installation or relocation of each forced-air or gravity-type furnace or burner including ducts and vents attached to such appliance, up to and including 100,000 Btu/h (29.3 kW)   $15.00
   For the installation or relocation of each forced-air or gravity-type furnace or burner including ducts and vents attached to such appliance over 100,000 Btu/h (29.3 kW)   $18.00
   For the installation or relocation of each floor furnace, including vent   $15.00
   For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater   $15.00
   2.   Appliance Vents
   For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit   $7.00
   3.   Alterations or Additions
   For the alteration of, or addition to, each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code   $14.00
   4.   Boilers, Compressors and Absorption Systems
   For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6 kW), or each absorption system to and including 100,000 Btu/h (29.3kW)   $15.00
   For the installation or relocation of each boiler or compressor over 3 horsepower (10.6 kW) to and including 15 horsepower (52.7 kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h (146.6 kW)   $28.00
   For the installation or relocation of each boiler or compressor over 15 horsepower (52.7 kW) to and including 30 horsepower (105.5 kW) or each or each absorption system over 500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h (293.1 kW)   $37.00
   For the installation or relocation of each boiler or compressor over 30 horsepower (105.5 kW) to and including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW)   $55.00
   For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW), or each absorption system over 1,750,000 Btu/h (512.9 kW)   $93.00
   5.   Air Handlers
   For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4719 L/s), including ducts attached thereto   $11.00
   Note: This fee does not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code.
   For each air-handling unit over 10,000 cfm (4719 L/s)   $18.00
   6.   Evaporative Coolers
   For each evaporative cooler other than portable type   $11.00
   7.   Ventilation and Exhaust
   For each ventilation fan connected to a single duct   $11.00
   8.   Incinerators
   For the installation or relocation of each domestic-type incinerator   $18.00
   For the installation or relocation of each commercial or industrial-type incinerator   $15.00
   9.   Miscellaneous
   For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which no fee is listed in the table   $11.00
   Other Inspections and Fees:
   1.   Inspections outside of normal business hours,   $50.00 per hour*
   (minimum charge two hours)
   2.   Reinspection fees assessed of    $50.00 per hour*,
    for work not ready for inspection.
   3.   Inspections for which no fee is specifically indicated,   $50.00 per hour*
   (minimum charge one-half hour)
   4.   Additional plan review required by changes, additions or revisions to plans   $50.00 per hour*
   (minimum charge one-half hour)
   * Or the total hourly cost to the jurisdiction, whichever is the greater. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved.
   (G)   Section [A] 106.5.3 Fee Refunds. Add to end of section, "The building official shall authorize the refunding of fees as follows:
   1.   The full amount of any fee paid hereunder which was erroneously paid or collected.
   2.   Not more than 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code.
   3.   Not more than 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is withdrawn or canceled before any plan review effort has been expended.
   The building official shall not authorize the refunding of any fee except upon written application filed by the original permittee not later than 180 days after the date of fee payment.”
   (H)   [A] 106.6 Emergency repairs. Where equipment replacements and repairs must be performed in an emergency situation, the permit application shall be submitted within the next working business day to the building official.
   (I)   Section [A] 108.4 Violation penalties. Any person who shall violate a provision of this code or shall fail to comply with any of the requirements thereof or who shall erect, install, alter, or repair mechanical work in violation of the approved construction documents or directive of the building official, or of a permit or certificate issued under the provision of this code, shall be subject to the penalty and fine described in this ordinance.
   (J)   Section [A] 108.5 Stop work orders. Any person who shall continue any work on the system after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to the penalty and fine described in this ordinance.
   (K)   Section [A] 109.2 Membership of board. The membership of the Building Advisory Board as prescribed in Section 150-008 of the Yuma City Code will be the Board of Appeals.
   (L)   Sections [A] 109.2.1 through [A] 109.7. Delete sections in their entirety.
   (M)   Section [BS] 301.16 Flood hazard. For structures located in flood hazard areas, mechanical systems, equipment and appliances shall be located at or above the elevation required in the adopted city floodplain ordinances for utilities and attendant equipment.
   Exception: Mechanical systems, equipment and appliances are permitted to be below the elevation required by the adopted city floodplain ordinances for utilities and attendant equipment provided that they are designed and installed to prevent water from entering or accumulating within the components and to resist hydrostatic and hydrodynamic loads and stresses, including the effects of buoyancy, during the occurrence of flooding up to such elevation.
   (N)   Section 303.3 Prohibited locations. Amend Exception #2 to read, "Solid fuel-fired appliances, provided that the room is not a confined space and as long as outdoor combustion air is provided."
   (O)   Section 304.11 Guards. Add exception to section to read, "Where due to roof size or other constraints the building official may approve alternate means to achieve compliance."
   (P)   Section 306.5.1 Sloped roofs. Amend first sentence to read, "Where appliances, equipment, fans or other components that require service are installed on a roof having a slope of greater than 4 units vertical in 12 units horizontal (33-percent slope) or greater and having an edge more than 30 inches (762 mm) above grade at such edge, a level platform shall be provided on each side of the appliance or equipment to which access is required for service, repair, or maintenance."
   (Q)   Section 307.2.1 Condensate disposal. Amend first sentence to read, "Condensate from all cooling and evaporators shall be conveyed from the drain pan outlet to an approved sanitary sewer connection, or other approved method of condensate disposal designed by a registered design professional."
   Add exceptions to section:
      "Exceptions:
      1.   Condensate from cooling coils and evaporators up to and including (4) ton units may drain into an approved bottom disposal pit. The approved bottom disposal pit shall consist of a pit excavated in the earth not less than 24 inches (61 mm) in any dimension completely filled with coarse gravel. The drainpipe shall extend into the pit not less than 6 inches (15 mm) below grade and shall be securely anchored in place. The drain shall not be covered with sod or earth until it has been inspected.
      2.   Equipment provided with a factory, or other approved, condensate evaporation device."
   (R)   Section 1101.6 General. Add to end of section, "Wind socks shall be installed on all industrial facilities utilizing ammonia refrigerant."
(Ord. O98-26, passed 4-15-98; Ord. O2004-35, passed 6-16-04; Ord. O2007-05, passed 1-17-07; Ord. O2015-037, passed 7-15-15; Ord. O2022-009, passed 5-4-22)