4.20.114.4   Approval for construction or placement of equipment or facilities.
   4.20.114.4.1.   The construction or placement of any equipment or facilities in the city by the franchisee (including temporary buildings, if needed), as well as any alterations or additions to existing city property, shall be approved in advance by the cable administrator. The franchisee shall provide the cable administrator thirty (30) days' notice prior to the commencement of work. All pedestals of the cable system owned and maintained by the franchisee shall be clearly marked as part of the system and as property of the franchisee.
   4.20.114.4.2.   Approval of the placement or location of cable system equipment or facilities may be denied, withdrawn or modified at any time if essential to avoid or minimize interference with city operations or activities. The franchisee shall not be entitled to reimbursement for any expenses associated with relocation of any equipment or facilities required by the withdrawal or modification of approval. The cable administrator shall have the right to require the franchisee to restore a site to its condition prior to the placement of cable system equipment or facilities if withdrawal of approval for such placement is deemed essential. (Ord. 205 § 3, 2001)