909.06 PROPER GRADE AND LINE TO BE OBTAINED.
   Any person installing or repairing curb or sidewalk shall notify the Building Official forty- eight hours prior to a concrete pour for inspection of the grade and line to be established. If the person performing the work is unclear as to what/how the grade should be established, they must indicate this when notifying the Building Official of the concrete pour so that the Official can be prepared to answer these questions. In any case. the specifications promulgated by the City Engineer must be complied with where, physically possible.
(Ord. 3-1996 §11. Passed 3-19-96.)