1375.03 MODIFICATION OF PLANS.
   A major modification to the storm water management/erosion and sedimentation control plan shall require a resubmittal of the plan and is to be processed in the same manner as the original submission.
(Ord. 13-1981 §1. Passed 5-20-81.)