(a) Developer To Provide. The developer shall provide the development with a complete sanitary sewer system to be connected to the City sanitary sewer system as specified by the Sewer Department and the City Engineer. All plans for the sanitary sewer system shall be prepared by the developer in accordance with standards and specifications of the Engineering Department approved by the Engineering Department and the Pennsylvania Department of Environmental Resources.
(b) Flood Areas. All new or replacement sanitary sewer systems within the flood prone areas shall be floodproofed up to a point one foot above the regulatory flood elevation to eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters.
(Ord. 12-1982 §6.60. Passed 11-3-82.)