(a) For each connection to the water system of the Village, fees shall be paid in accordance with the following schedule:
(1) Connection rates.
Meter Size | Price |
Meter Size | Price |
5/8 x 3/4" | $2,308 |
1" | $3,444 |
1 ½" | $7,486 |
2" | $13,253 |
3" | $21,253 |
4" | $38,983 |
6" | $63,969 |
8" | $125,498 |
10" | $164,687 |
12" | $201,493 |
(2) When the service line is installed by the Village the fee charged shall be the actual, direct costs for labor, equipment, time and materials, incurred by the Village plus sixty percent of all such direct costs for overhead and administration.
(3) When the service line is not installed by the Village the following fees shall be charged:
Meter Size | Price
|
5/8 x 3/4" | $80 |
1" and above | At cost (for each meter) |
(4) When the water tap is made by the Village and the rest of the service is installed by the property owner, then the following fees shall be charged:
Meter Size | Price
|
5/8 x 3/4" | $75 |
1" and above | At cost (for each meter) |
(b) No connection shall be made without the issuance of a written permit to do so by the Village Manager. The property owner and the person employed to perform the work shall be jointly responsible for a proper connection to the water distribution system. Proper connection for every water service shall be deemed to include a water meter pit, installed and constructed in accordance with Village specifications, such meter pit to be located not less than one foot from the front property line (or easement line closest to the water main) nor more than six feet from such line. Meter pit materials, installation and construction shall be at the expense of the property owner, except that the Village will furnish the water meter, the meter yoke and the yoke valves when the meter pit installation has been inspected and approved by the Village.
(c) Connections shall be made in a manner approved by the Village Manager and shall not be less than three-fourths of an inch in size. If larger connections are required, the connection fee under subsections paragraphs (a)(2), (3) and (4) hereof shall be the actual cost of installation of such connection.
(Ord. 77-12. Passed 11-7-77; Ord. 78-14. Passed 8-21-78; Ord. 81-8. Passed 6-15-81; Ord. 86-9. Passed 6-2-86; Ord. 2017-30. Passed 10-16-17; Ord. 2020-03. Passed 4-6-20; Ord. 2022-26. Passed 6-21-22.)