10-5-6: FINAL DRAINAGE STUDY:
The final drainage study and report shall be prepared for submittal to the town engineer at the time when improvement plans are submitted for review. The study and report shall provide the same items specified for the "Preliminary Drainage Plan" except that all calculations, maps, and charts shall reflect the final design for all improvements. (Ord. 93-9, 6-14-1993)