Administrative decisions shall include:
Minor site plans
Final plats
Zoning compliance permits
NOTE: A certificate of occupancy shall not be issued until an as-built survey outlining all completed site improvements has been submitted to the UDO Administrator.
155.5.4.2 Application for Review. An applicant desiring to obtain site plan approval shall file with the UDO Administrator two copies of the site plan, together with a completed application form and the required fee as set forth in Section 155.2.9.
155.5.4.3 Planning Staff and Technical Review Procedure. The UDO Administrator or his/her designee will review the site plan and may require the Technical Review Procedure as specified in Article 155.3, Part II. The plan will be reviewed for compliance with this Ordinance and all related plans and policies.
155.5.4.5 Zoning Inspections and Certificates of Occupancy. Prior to the issuance of a certificate of occupancy by the Building Inspections Department, the UDO Administrator or his designee shall conduct a final zoning inspection to ensure that the approved plan has been followed and all required improvements have been installed to town standards. Prior to the final zoning inspection, an as-built survey must be submitted to the UDO Administrator. The as-built survey shall be drafted and scaled by a surveyor registered in the State of North Carolina and should show the location of all site improvements.
(Ord. 1695, passed 11-8-12; Am. Ord. 1838, passed 3-10-22)