§ 154.51 ROAD AND HIGHWAY IMPROVEMENTS.
   (A)   The full width of the right-of-way shall be graded, including the subgrade of the areas to be paved, in accordance with standards and specifications for road construction as approved by the County Board.
   (B)   Unless the township wherein a plat is located requests that no paving be provided and the County Board accepts the township recommendations, all roads to be paved shall be of an overall width in accordance with the standards and specifications for road construction as approved by the County Board.
   (C)   Curb and gutter shall be constructed as required by the standards and specifications for road construction as approved by the County Board.
   (D)   Storm sewers, culverts, storm water inlets and other drainage facilities will be required where they are necessary to ensure adequate storm water drainage for the subdivision. Where required, such drainage facilities shall be constructed in accordance with the standards and specifications for road construction as approved by the County Board.
   (E)   Road signs of the standard design approved by the County Board shall be installed at each street or road intersection.
   (F)   (1)   The number and types of access drives onto major streets shall be controlled and limited in the interest of public safety and efficient traffic flow.
      (2)   Access drives onto county roads shall require a permit from the County Engineer. This permit shall be acquired prior to the issuance of any building permits. The County Engineer shall determine the appropriate location, size and design of such access drives and may limit the number of access drives in the interest of public safety and efficient traffic flow. The County Engineer may refer the request for an access drive permit onto a county road to the Planning Commission for its comment.
(Ord. passed 12-11-1979)