(A) No unauthorized person shall uncover, make any connections with or opening into, use, alter, or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the town.
(B) (1) There shall be two classes of building sewer permits:
(a) For residential and commercial service; and
(b) For service to establishments producing industrial wastes.
(2) In either case, the owner or his or her agent shall make application on a special form furnished by the said town. The permit application shall be supplemented by any plans, specifications, or other information considered pertinent in the judgement of the Inspector. A permit and inspection fee of $25 for a residential or commercial building sewer permit and $25 for an industrial building sewer permit shall be paid to the Clerk-Treasurer at the time the application is filed.
(C) All costs and expense incident to the installation and connection of the building sewer shall be borne by the owner. The owner shall indemnify the town for any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer.
(D) A separate and independent building sewer shall be provided for every building; except where one building stands at the rear of another on an interior lot and no private sewer is available or can be constructed to the rear building through an adjoining alley, court yard, or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer.
(E) Old building sewers may be used in connection with new buildings only when they are found, on examination and tested by the Inspector, to meet all requirements of this subchapter.
(F) (1) The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the town.
(2) In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. 9 shall apply.
(1993 Code, Title V, Art. 9, § 5) Penalty, see § 10.99