1122.10 MAINTENANCE AND NON-USE.
   (a)    All alternative energy systems and related components shall be properly maintained and kept in operation. Any alternative energy system that remains non-functional or inoperative for a continuous period of six months shall be deemed to be abandoned and shall constitute a public nuisance. This shall not include functioning systems used for backup power or emergency situations.
   (b)   Removal of the alternative energy system shall include the. removal of the entire structure, including foundations, transmission/interconnection equipment. Failure to remove the alternative energy system shall be deemed a violation of this subchapter and shall be handled in the same manner as other nuisances.
(Ord. 3-2019. Passed 4-22-19.)