1046.22 PIPES REQUIRED TO BE SEALED.
   The sewer pipe inside any building or structure shall be sealed and remain sealed and watertight until such time as the plumbing is carried on the first floor, and the basement, if any, is backfilled and the roof is on the building.
(Ord. 135. Passed 5-10-00.)