820.32 INITIAL SERVICE AREA.
   (a)   If required by the Village, Grantee's proposal shall indicate the date by which system engineering and design shall be completed and dates on which each state of system construction shall be completed.
   (b)   The energized cable shall be extended substantially throughout the Village (as determined by the Village) within eighteen months after commencement of construction or as otherwise provided in the franchise agreement. All persons along the route of the energized cable who desire them shall have individual drops installed within the same period of time.
   (c)   If required by the Village, a map prepared by Grantee reflecting the areas within the Village initially served by the system along with the schedule for development of the system shall be included in Grantee's proposal.
   (d)   The Village shall cooperate with Grantee in the development of its proposed service areas by making available to Grantee for copying all maps, data and other statistical information then in possession of the Village needed for the preparation of a map defining the initial service area.
(Ord. 141. Passed 2-12-03.)