§ 50.095 CONNECTION REQUIREMENTS.
   (A)   The connection of the building sewer and/or water service into the public mains shall conform to the requirements of the Building and Plumbing Code or other applicable rules and regulations of the village, or the procedures set forth in appropriate specifications of the American Society of Testing Materials, Water Pollution Control Federation Manual of Practice No. 9, and Standard Specifications for Water and Sewer Main Construction in Illinois. Any deviation from the prescribed procedures and materials must be approved by the Superintendent before installation.
   (B)   All work performed shall be in accordance with accepted engineering practices.
('79 Code, § 1107) (Ord. 1983-O-5, passed 4-19-83) Penalty, see § 50.999