§ 153.077 STREETS AND ALLEYS.
   (A)    The developer shall construct all proposed streets.
   (B)   The proposed streets shall be designed and inspected by a professional engineer, licensed by the state, at the cost of the developer and have the following minimum improvements:
      (1)   The removal of all top soil and grading to meet drainage requirements;
      (2)   Whether a concrete, bituminous or asphalt street is proposed, the developer will be responsible for curb and gutter and the standard six-inch base course, the city will be responsible for surfacing with permanent surface paving as determined by the city, at a time when allowed by budget and availability of materials. The city shall provide for completion of a permanent street surface within two years following completion of the developer’s obligations under this chapter for design and installation of water distribution system, sanitary sewers, drainage, curb and gutter, and sufficient base course. The city will be responsible for dust control if paving is to be delayed and the city may utilize a temporary paving material such are recycled asphalt until such time as the permanent paving is installed; and
      (3)   A 32-inch “B” curb with gutter is required, surmountable curbs are allowed.
   (C)   The above standards are the minimum acceptable standards; the city reserves the right to modify these standards upon review by the City Engineer and approval of the City Council.
   (D)   Construction methods and materials shall meet or exceed standards in the most recent edition of Standard Specifications for Roads and Bridges as published by the State Department of Transportation; unless waived by the City Council.
(Prior Code, § 15.05.03) (Ord. 748, passed - - ; Ord. 1056, passed 8-7-2023)