In all areas of special flood hazards, the following provisions are required.
(A) All new construction and substantial improvements shall be anchored to prevent flotation, collapse or lateral movement of the structure.
(B) All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.
(C) All new construction or substantial improvements shall be constructed by methods and practices that minimize flood damage.
(D) All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of flood waters into the system.
(E) New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of flood waters into the systems and discharges from the systems into flood waters.
(F) On-site waste disposal systems shall be located to avoid impairment to them or contamination from them during flooding.
(G) The storage or processing of materials that are in time of flooding buoyant, flammable, explosive or could be injurious to human, animal or plant life is prohibited.
(H) Storage of other material or equipment may be allowed if not subject to major damage by floods and firmly anchored to prevent flotation or it readily removable from the area within the time available after flood warning.
(Prior Code, § 14.07.11) (Ord. 580, passed - -; Ord. 731, passed - -)