§ 52.062 COMPLIANCE.
   The size, slopes, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling of the trench shall all conform to the requirements of the State of Minnesota Building and Plumbing Code or other applicable rules and regulations of the city. In the absence of code provisions or in the amplification thereof, the materials and procedures set forth in appropriate specifications of the ASTM and WPCF Manual of Practice No. 9 shall apply.
(Ord. 117, passed 2-26-86)