§ 156.254 PD REZONING REQUEST; FILING REQUIREMENTS.
   (A)   After a pre-submission meeting the petitioner may file a rezoning request to one of the PD classifications. The last working day of each month is the deadline for a petitioner to make a complete submission intended to be heard as a rezoning request no sooner than the Commission’s public meeting about one and one-half months later.
   (B)   This submission shall contain the following:
      (1)   A non-refundable processing fee as set by the Commission;
      (2)   A signed and notarized petition to rezone, with metes and bounds legal description, indicating the PD classification being sought, signed by the owner or owners of all property involved, or with a notarized affidavit of consent of all owners attached;
      (3)   A list of names, addresses, and auditor’s key numbers of all property owners located 300 feet adjacent to and directly across the street, alley, or railroad right-of-way from the property described in division (B)(2) above;
      (4)   One notice of public hearing, with a metes and bounds or other proper legal description and the common address or location of the property;
      (5)   A letter notifying the staff of the petitioner’s intent to submit notices of public hearings to the designated newspaper;
      (6)   A typed original and an amount of copies as determined by the Zoning Administrator, including a PDF submittal, of the proposed ordinance to rezone the property, using the sample format provided by the staff;
      (7)   Two sets of drawings, including a PDF submittal, labeled Draft Plan, using the format described in Chapter 155 of this code; to include a published and recorded boundary survey meeting the requirements of 865 I.A.C. 1 through 12 or its successor; and
      (8)   Two copies, including a PDF submittal, of any proposed covenants and horizontal property ownership and owners’ association documents, including amendment provisions that conform to § 156.263. These shall include a table of contents, and be written in plain language easily understood by most readers.
   (C)   List of Technical Advisory Committee (TAC) members:
      (1)   Zoning Administrator;
      (2)   Town Building Administrator;
      (3)   Town Engineer;
      (4)   Designee of Indiana American Water;
      (5)   Designee of the Winfield Sewer Board;
      (6)   Plan Commission Attorney;
      (7)   Three Members of the Plan Commission;
      (8)   County Highway Department;
      (9)   County Drainage Board (County Surveyor);
      (10)   Volunteer Fire Department;
      (11)   Any additional agencies as requested by staff;
      (12)   Soil and Water Conservation District; and
      (13)   Designee of town Stormwater Board.
   (D)   If the petitioner fails to meet the filing requirements of this section within six months of the pre- submission meeting date, the petitioner shall schedule a new pre-submission meeting, as per § 156.253 of this code, in order to continue the project.
(Ord. 23, § 3.80.50, passed 3-19-1997; Am. Ord. 191, passed 6-15-2010; Am. Ord. 23-A, passed 2-8-2022)