§ 155.033 SURVEYING REQUIREMENTS.
   (A)   General. Every subdivision of land under the terms of this chapter shall require a survey meeting the requirements of Title 865 IAC Rule 12 and the following requirements prepared by a surveyor registered in this state.
   (B)   Requirements. The description and location of all survey monuments placed in the subdivision shall be shown upon all maps of record.
      (1)   Permanent monuments shall be of 5/8-inch steel rod encased in concrete with a diameter of four to six inches and when feasible 36 inches deep, set flush with the ground. Road centerline control monumentation shall also be set.
      (2)   Block corners shall be established by placement of an iron rod or pipe not less than 5/8-inch in diameter and not less than two feet long and shall be driven flush with the ground. All points of intersection between lot lines and section, quarter section, or quarter section lines shall be marked and referenced with an iron rod or pipe in an approved manner. Permanent monuments shall be erected at all corners or changes in bearing of the exterior boundary of the subdivision. All monuments shall be installed pursuant to Title 865 IAC Rule 12.
   (C)   Certificates. Each and all secondary plats shall bear thereon or incorporated by reference thereon, the following certificates, as shown in Appendix A of this chapter:
      (1)   Plan Commission certificate;
      (2)   Land surveyor’s certificate;
      (3)   Deed of dedication; and
      (4)   Utility easement.
(Ord. 27, §§ 7.20.10 - 7.20.30, passed 4-16-1997; Am. Ord. 210, passed 9-11-2012)