§ 111.081 ADDITIONAL FACILITIES; REQUIREMENTS; PLANNED INFRASTRUCTURE.
   When a franchisee installs any new underground facilities, the franchisee shall, unless waived by the city, simultaneously install conduit provided by the city (“city conduit”). The city shall reimburse franchisee for any marginal or additional costs incurred by franchisee in connection with installation of the city conduit. The city conduit shall be installed in accordance with the city specifications and consistent with sound engineering practice. No franchise fee shall apply to any city conduit.
(Ord. 2 S2018/2019, passed 10-8-2018)