Skip to code content (skip section selection)
Compare to:
Windsor Heights Overview
Windsor Heights, IA Code of Ordinances
WINDSOR HEIGHTS, IA CODE OF ORDINANCES
SUPPLEMENT RECORD
CHAPTER 1 CODE OF ORDINANCES
CHAPTER 2 CHARTER
CHAPTER 3 BOUNDARIES
CHAPTER 4 MUNICIPAL INFRACTIONS
CHAPTER 5 OPERATING PROCEDURES
CHAPTER 6 CITY ELECTIONS
CHAPTER 7 FISCAL MANAGEMENT
CHAPTER 8 URBAN RENEWAL
CHAPTER 9 HOTEL-MOTEL TAX
CHAPTER 10 DEFERRED COMPENSATION FOR CITY EMPLOYEES
CHAPTER 11 URBAN REVITALIZATION
CHAPTER 15 MAYOR
CHAPTER 16 MAYOR PRO TEM
CHAPTER 17 CITY COUNCIL
CHAPTER 18 CITY CLERK
CHAPTER 19 FINANCE DIRECTOR/TREASURER
CHAPTER 20 CITY ATTORNEY
CHAPTER 21 CITY ADMINISTRATOR
CHAPTER 22 PUBLIC WORKS DIRECTOR
CHAPTER 23 PLANNING AND ZONING COMMISSION
CHAPTER 30 POLICE DEPARTMENT
CHAPTER 30.11 UNBIASED POLICING POLICY
CHAPTER 31 ALARM SYSTEMS
CHAPTER 35 FIRE DEPARTMENT
CHAPTER 36 HAZARDOUS SUBSTANCE SPILLS
CHAPTER 37 FIRE CODE
CHAPTER 40 PUBLIC OFFENSES
CHAPTER 50 NUISANCE ABATEMENT PROCEDURE
CHAPTER 51 DAMAGED OR INOPERABLE VEHICLES
CHAPTER 52 ABANDONED VEHICLES
CHAPTER 53 LITTER CONTROL
CHAPTER 54 NOISE POLLUTION
CHAPTER 55 ANIMAL PROTECTION AND CONTROL
CHAPTER 56 DANGEROUS DOGS
CHAPTER 57 ILLEGAL OR DANGEROUS ANIMALS
CHAPTER 60 TRAFFIC AND VEHICLES
CHAPTER 90 WATER SERVICE SYSTEM
CHAPTER 91 CROSS CONNECTION CONTROL
CHAPTER 95 SANITARY SEWER SYSTEM
CHAPTER 96 BUILDING SEWERS AND CONNECTIONS
CHAPTER 97 USE OF PUBLIC SEWERS
CHAPTER 98 ON-SITE WASTEWATER SYSTEMS
CHAPTER 100 REGULATION OF INDUSTRIAL WASTEWATER AND COMMERCIAL WASTEWATER
CHAPTER 101 STORM WATER DRAINAGE UTILITY
CHAPTER 102 ILLICIT DISCHARGE TO STORM SEWER SYSTEM
CHAPTER 105 SOLID WASTE CONTROL AND RECYCLING
CHAPTER 106 COLLECTION OF SOLID WASTE
CHAPTER 107 SOLID WASTE DISPOSAL
CHAPTER 110 NATURAL GAS FRANCHISE
CHAPTER 111 ELECTRIC FRANCHISE
CHAPTER 112 FRANCHISE FEES
CHAPTER 113 CABLE TELEVISION REGULATIONS
CHAPTER 120 LIQUOR LICENSES AND WINE AND BEER PERMITS
CHAPTER 121 CIGARETTE AND TOBACCO PERMITS
CHAPTER 122 PEDDLERS, SOLICITORS AND TRANSIENT MERCHANTS
CHAPTER 123 HOUSE MOVERS
CHAPTER 124 PAWNBROKERS
CHAPTER 125 ADULT ENTERTAINMENT FACILITIES
CHAPTER 126 PUBLIC DANCE HALLS
CHAPTER 135 EXCAVATIONS OF PUBLIC PROPERTY
CHAPTER 136 SIDEWALK REGULATIONS
CHAPTER 137 VACATION AND DISPOSAL OF STREETS
CHAPTER 138 STREET AND SIDEWALK GRADES
CHAPTER 139 NAMING OF STREETS
CHAPTER 140 DRIVEWAY REGULATIONS
CHAPTER 141 FIBER OPTIC CABLE LICENSE
CHAPTER 142 PARKLETS
CHAPTER 150 BUILDING NUMBERING
CHAPTER 151 TREES AND VEGETATION
CHAPTER 152 TEMPORARY STRUCTURES
CHAPTER 153 TEMPORARY SIGNS
CHAPTER 155 BUILDING CODES
CHAPTER 156 PROPERTY MAINTENANCE AND RENTAL HOUSING CODE
CHAPTER 157 STANDARD CONSTRUCTION SPECIFICATIONS
CHAPTER 158 MECHANICAL CODE
CHAPTER 159 PLUMBING CODE
CHAPTER 160 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL
CHAPTER 161 POST-CONSTRUCTION STORM WATER CONTROL
CHAPTER 162 FUEL GAS CODE
CHAPTER 163 DEMOLITION & RAZE PERMIT
CHAPTER 165 ZONING CODE - GENERAL PROVISIONS
CHAPTER 166 ZONING CODE - DEFINITIONS
CHAPTER 167 ZONING CODE - USE TYPES
CHAPTER 168 ZONING CODE - ZONING DISTRICT REGULATIONS
CHAPTER 169 ZONING CODE - OVERLAY DISTRICTS
CHAPTER 170 ZONING CODE - DEVELOPMENT AND DESIGN STANDARDS
CHAPTER 171 TEMPORARY USES AND STRUCTURES
CHAPTER 172 ZONING CODE - SUPPLEMENTAL SITE DEVELOPMENT REGULATIONS
CHAPTER 173 ZONING CODE - LANDSCAPING AND SCREENING STANDARDS
CHAPTER 174 ZONING CODE - OFF-STREET PARKING
CHAPTER 175 ZONING CODE - SIGN REGULATIONS
CHAPTER 176 ZONING CODE - NONCONFORMING DEVELOPMENT
CHAPTER 177 ZONING CODE - ADMINISTRATION AND PROCEDURES
CHAPTER 178 COMPREHENSIVE PLAN
CHAPTER 179 BOARD OF ADJUSTMENT
CHAPTER 180 CONDITIONAL USE PERMITS
CHAPTER 181 ADMINISTRATION AND ENFORCEMENT
CHAPTER 183 MOBILE FOOD UNITS
CHAPTER 185 FLOODPLAIN MANAGEMENT
185.04 ADMINISTRATION.
   1.   Appointment, Duties and Responsibilities of Local Official.
      A.   The Building Official is hereby appointed to implement and administer the provisions of this ordinance and will herein be referred to as the Administrator.
      B.   Duties and responsibilities of the Administrator shall include, but not necessarily be limited to the following:
         (1)   Review all floodplain development permit applications to assure that the provisions of this ordinance will be satisfied.
         (2)   Review floodplain development applications to assure that all necessary permits have been obtained from federal, state and local governmental agencies including approval when required from the Department of Natural Resources for floodplain construction.
         (3)   Record and maintain a record of (i) the elevation (in relation to North American Vertical Datum 1988) of the lowest floor (including basement) of all new or substantially improved structures or (ii) the elevation to which new or substantially improved structures have been floodproofed.
         (4)   Notify adjacent communities/counties and the Department of Natural Resources prior to any proposed alteration or relocation of a watercourse and submit evidence of such notifications to the Federal Emergency Management Agency.
         (5)   Keep a record of all permits, appeals and such other transactions and correspondence pertaining to the administration of this ordinance.
         (6)   Submit to the Federal Insurance Administrator an annual report concerning the community’s participation, utilizing the annual report form supplied by the Federal Insurance Administrator.
         (7)   Notify the Federal Insurance Administration of any annexations or modifications to the community’s boundaries.
         (8)   Review subdivision proposals to insure such proposals are consistent with the purpose of this ordinance and advise the Planning and Zoning Commission of potential conflict.
         (9)   Maintain the accuracy of the community’s Flood Insurance Rate Maps when:
            a.   Development placed within the Floodway (Overlay) District results in any of the following:
            An increase in the base flood elevations, or
            Alteration to the floodway boundary.
            b.   Development place in Zones A, AE, AH, and A1-30 that does not include a designated floodway that will cause a rise of more than one foot in the base elevation; or
            c.   Development relocates or alters the channel.
            Within 6 months of the completion of the development, the applicant shall submit to FEMA all scientific and technical data necessary for a Letter of Map Revision.
         (10)   Perform site inspections to ensure compliance with the standards of this ordinance.
         (11)   Forward all requests for variances to the Board of Adjustment for consideration. Ensure all requests include the information ordinarily submitted with applications as well as any additional information deemed necessary to the Board of Adjustment.
   2.   Floodplain Development Permit.
      A.   Permit Required. A Floodplain Development Permit issued by the Administrator shall be secured prior to any floodplain development (any man-made change to improved and unimproved real estate, including but not limited to buildings or other structures, mining, filling, grading, paving, excavation or drilling operations), including the placement of factory-built homes.
      B.   Application for Permit. Application shall be made on forms furnished by the Administrator and shall include the following:
         (1)   Description of the work to be covered by the permit for which application is to be made.
         (2)   Description of the land on which the proposed work is to be done (i.e., lot, block, track, street address or similar description) that will readily identify and locate the work to be done.
         (3)   Location and dimensions of all buildings and building additions.
         (4)   Indication of the use or occupancy for which the proposed work is intended.
         (5)   Elevation of the base flood.
         (6)   Elevation (in relation to North American Vertical Datum 1988) of the lowest floor (including basement) of buildings or of the level to which a building is to be floodproofed.
         (7)   For buildings being improved or rebuilt, the estimated cost of improvements and market value of the building prior to the improvements.
         (8)   Such other information as the Administrator deems reasonably necessary (e.g., drawings or a site plan) for the purpose of this ordinance.
      C.   Action on Permit Application. The Administrator shall, within a reasonable time, make a determination as to whether the proposed floodplain development meets the applicable standards of this ordinance and shall approve or disapprove the application. For disapprovals, the applicant shall be informed, in writing, of the specific reasons therefore. The Administrator shall not issue permits for variances except as directed by the County Board of Adjustment.
      D.   Construction and Use to be as Provided in Application and Plans. Floodplain Development Permits based on the basis of approved plans and applications authorize only the use, arrangement, and construction set forth in such approved plans and applications and no other use, arrangement or construction. Any use, arrangement, or construction at variance with that authorized shall be deemed a violation of this ordinance. The applicant shall be required to submit certification by a professional engineer or land surveyor, as appropriate, registered in the State of Iowa, that the finished fill, building floor elevations, floodproofing, or other flood protection measures were accomplished in compliance with the provisions of this ordinance, prior to the use or occupancy of any structure.