Skip to code content (skip section selection)
Compare to:
Windsor Heights Overview
Windsor Heights, IA Code of Ordinances
WINDSOR HEIGHTS, IA CODE OF ORDINANCES
ORDINANCES PENDING CODIFICATION
SUPPLEMENT RECORD
CHAPTER 1 CODE OF ORDINANCES
CHAPTER 2 CHARTER
CHAPTER 3 BOUNDARIES
CHAPTER 4 MUNICIPAL INFRACTIONS
CHAPTER 5 OPERATING PROCEDURES
CHAPTER 6 CITY ELECTIONS
CHAPTER 7 FISCAL MANAGEMENT
CHAPTER 8 URBAN RENEWAL
CHAPTER 9 HOTEL-MOTEL TAX
CHAPTER 10 DEFERRED COMPENSATION FOR CITY EMPLOYEES
CHAPTER 11 URBAN REVITALIZATION
CHAPTER 15 MAYOR
CHAPTER 16 MAYOR PRO TEM
CHAPTER 17 CITY COUNCIL
CHAPTER 18 CITY CLERK
CHAPTER 19 FINANCE DIRECTOR/TREASURER
CHAPTER 20 CITY ATTORNEY
CHAPTER 21 CITY ADMINISTRATOR
CHAPTER 22 PUBLIC WORKS DIRECTOR
CHAPTER 23 PLANNING AND ZONING COMMISSION
CHAPTER 30 POLICE DEPARTMENT
CHAPTER 30.11 UNBIASED POLICING POLICY
CHAPTER 31 ALARM SYSTEMS
CHAPTER 35 FIRE DEPARTMENT
CHAPTER 36 HAZARDOUS SUBSTANCE SPILLS
CHAPTER 37 FIRE CODE
CHAPTER 40 PUBLIC OFFENSES
CHAPTER 50 NUISANCE ABATEMENT PROCEDURE
CHAPTER 51 DAMAGED OR INOPERABLE VEHICLES
CHAPTER 52 ABANDONED VEHICLES
CHAPTER 53 LITTER CONTROL
CHAPTER 54 NOISE POLLUTION
CHAPTER 55 ANIMAL PROTECTION AND CONTROL
CHAPTER 56 DANGEROUS DOGS
CHAPTER 57 ILLEGAL OR DANGEROUS ANIMALS
CHAPTER 60 TRAFFIC AND VEHICLES
CHAPTER 90 WATER SERVICE SYSTEM
CHAPTER 91 CROSS CONNECTION CONTROL
CHAPTER 95 SANITARY SEWER SYSTEM
CHAPTER 96 BUILDING SEWERS AND CONNECTIONS
CHAPTER 97 USE OF PUBLIC SEWERS
CHAPTER 98 ON-SITE WASTEWATER SYSTEMS
CHAPTER 100 REGULATION OF INDUSTRIAL WASTEWATER AND COMMERCIAL WASTEWATER
CHAPTER 101 STORM WATER DRAINAGE UTILITY
CHAPTER 102 ILLICIT DISCHARGE TO STORM SEWER SYSTEM
CHAPTER 105 SOLID WASTE CONTROL AND RECYCLING
CHAPTER 106 COLLECTION OF SOLID WASTE
CHAPTER 107 SOLID WASTE DISPOSAL
CHAPTER 110 NATURAL GAS FRANCHISE
CHAPTER 111 ELECTRIC FRANCHISE
CHAPTER 112 FRANCHISE FEES
CHAPTER 113 CABLE TELEVISION REGULATIONS
CHAPTER 120 LIQUOR LICENSES AND WINE AND BEER PERMITS
CHAPTER 121 CIGARETTE AND TOBACCO PERMITS
CHAPTER 122 PEDDLERS, SOLICITORS AND TRANSIENT MERCHANTS
CHAPTER 123 HOUSE MOVERS
CHAPTER 124 PAWNBROKERS
CHAPTER 125 ADULT ENTERTAINMENT FACILITIES
CHAPTER 126 PUBLIC DANCE HALLS
CHAPTER 135 EXCAVATIONS OF PUBLIC PROPERTY
CHAPTER 136 SIDEWALK REGULATIONS
CHAPTER 137 VACATION AND DISPOSAL OF STREETS
CHAPTER 138 STREET AND SIDEWALK GRADES
CHAPTER 139 NAMING OF STREETS
CHAPTER 140 DRIVEWAY REGULATIONS
CHAPTER 141 FIBER OPTIC CABLE LICENSE
CHAPTER 142 PARKLETS
CHAPTER 150 BUILDING NUMBERING
CHAPTER 151 TREES AND VEGETATION
CHAPTER 152 TEMPORARY STRUCTURES
CHAPTER 153 TEMPORARY SIGNS
CHAPTER 155 BUILDING CODES
CHAPTER 156 PROPERTY MAINTENANCE AND RENTAL HOUSING CODE
CHAPTER 157 STANDARD CONSTRUCTION SPECIFICATIONS
CHAPTER 158 MECHANICAL CODE
CHAPTER 159 PLUMBING CODE
CHAPTER 160 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL
CHAPTER 161 POST-CONSTRUCTION STORM WATER CONTROL
CHAPTER 162 FUEL GAS CODE
CHAPTER 163 DEMOLITION & RAZE PERMIT
CHAPTER 165 ZONING CODE - GENERAL PROVISIONS
CHAPTER 166 ZONING CODE - DEFINITIONS
CHAPTER 167 ZONING CODE - USE TYPES
CHAPTER 168 ZONING CODE - ZONING DISTRICT REGULATIONS
CHAPTER 169 ZONING CODE - OVERLAY DISTRICTS
CHAPTER 170 ZONING CODE - DEVELOPMENT AND DESIGN STANDARDS
CHAPTER 171 TEMPORARY USES AND STRUCTURES
CHAPTER 172 ZONING CODE - SUPPLEMENTAL SITE DEVELOPMENT REGULATIONS
CHAPTER 173 ZONING CODE - LANDSCAPING AND SCREENING STANDARDS
CHAPTER 174 ZONING CODE - OFF-STREET PARKING
CHAPTER 175 ZONING CODE - SIGN REGULATIONS
CHAPTER 176 ZONING CODE - NONCONFORMING DEVELOPMENT
CHAPTER 177 ZONING CODE - ADMINISTRATION AND PROCEDURES
CHAPTER 178 COMPREHENSIVE PLAN
CHAPTER 179 BOARD OF ADJUSTMENT
CHAPTER 180 CONDITIONAL USE PERMITS
CHAPTER 181 ADMINISTRATION AND ENFORCEMENT
CHAPTER 183 MOBILE FOOD UNITS
CHAPTER 185 FLOODPLAIN MANAGEMENT
100.10 USER REQUIREMENTS.
   1.   The following requirements shall apply to all users of the POTW:
      A.   All users shall promptly notify the WRA Director in advance of any substantial change in the volume or character of pollutants in their discharge.
      B.   New or increased contributions of pollutants or changes in the nature of pollutant discharged to the POTW shall require prior approval by the WRA Director.
      C.   Industrial users shall notify the WRA Director, the Environmental Protection Agency Regional Waste Management Division Director, and state hazardous waste authorities in writing of any discharge into the POTW of a substance which, if otherwise disposed of, would be a hazardous waste under 40 CFR 261. The notification shall comply with the requirements set forth in 40 CFR 403.12(p).
      D.   Discharge of any pollutants without the notice and approval required by this section is prohibited. Upon the receipt of notice required by this section, the WRA Director shall within 180 days or less approve the discharge if he or she finds the proposed discharge meets applicable pretreatment standards and requirements and would not cause the WRA to violate its National Pollutant Discharge Elimination System permit. The WRA Director shall deny permission for the discharge if he or she finds applicable pretreatment standards and requirements are not met or the discharge would cause a violation of the National Pollutant Discharge Elimination System permit for the WRF.
   In lieu of denial of permission for discharge, the WRA Director may allow such discharge or contribution upon conditions which would not violate applicable pretreatment standards or requirements and would not cause a violation of the National Pollutant Discharge Elimination System permit for the WRF.
      E.   Food service establishments shall be regulated first under Division 5 of this ordinance but may be required to obtain a wastewater discharge permit and be subject to the requirements of Divisions 1-4 if the WRA Director determines that additional pretreatment is required in order to comply with fat, oil, & grease discharge limits.
   2.   Any part of this section notwithstanding, upon receipt of the notice required by this section, the WRA Director may require, in addition to the requirements of this section, that an industrial user obtain a permit under this chapter.
   3.   Users who are determined to be industrial users as herein defined and who refuse to apply for or obtain a wastewater discharge permit shall be subject to termination of sewer services as provided in Section 100.47 hereof.