Skip to code content (skip section selection)
Compare to:
Windsor Heights Overview
Windsor Heights, IA Code of Ordinances
WINDSOR HEIGHTS, IA CODE OF ORDINANCES
ORDINANCES PENDING CODIFICATION
SUPPLEMENT RECORD
CHAPTER 1 CODE OF ORDINANCES
CHAPTER 2 CHARTER
CHAPTER 3 BOUNDARIES
CHAPTER 4 MUNICIPAL INFRACTIONS
CHAPTER 5 OPERATING PROCEDURES
CHAPTER 6 CITY ELECTIONS
CHAPTER 7 FISCAL MANAGEMENT
CHAPTER 8 URBAN RENEWAL
CHAPTER 9 HOTEL-MOTEL TAX
CHAPTER 10 DEFERRED COMPENSATION FOR CITY EMPLOYEES
CHAPTER 11 URBAN REVITALIZATION
CHAPTER 15 MAYOR
CHAPTER 16 MAYOR PRO TEM
CHAPTER 17 CITY COUNCIL
CHAPTER 18 CITY CLERK
CHAPTER 19 FINANCE DIRECTOR/TREASURER
CHAPTER 20 CITY ATTORNEY
CHAPTER 21 CITY ADMINISTRATOR
CHAPTER 22 PUBLIC WORKS DIRECTOR
CHAPTER 23 PLANNING AND ZONING COMMISSION
CHAPTER 30 POLICE DEPARTMENT
CHAPTER 30.11 UNBIASED POLICING POLICY
CHAPTER 31 ALARM SYSTEMS
CHAPTER 35 FIRE DEPARTMENT
CHAPTER 36 HAZARDOUS SUBSTANCE SPILLS
CHAPTER 37 FIRE CODE
CHAPTER 40 PUBLIC OFFENSES
CHAPTER 50 NUISANCE ABATEMENT PROCEDURE
CHAPTER 51 DAMAGED OR INOPERABLE VEHICLES
CHAPTER 52 ABANDONED VEHICLES
CHAPTER 53 LITTER CONTROL
CHAPTER 54 NOISE POLLUTION
CHAPTER 55 ANIMAL PROTECTION AND CONTROL
CHAPTER 56 DANGEROUS DOGS
CHAPTER 57 ILLEGAL OR DANGEROUS ANIMALS
CHAPTER 60 TRAFFIC AND VEHICLES
CHAPTER 90 WATER SERVICE SYSTEM
CHAPTER 91 CROSS CONNECTION CONTROL
CHAPTER 95 SANITARY SEWER SYSTEM
CHAPTER 96 BUILDING SEWERS AND CONNECTIONS
CHAPTER 97 USE OF PUBLIC SEWERS
CHAPTER 98 ON-SITE WASTEWATER SYSTEMS
CHAPTER 100 REGULATION OF INDUSTRIAL WASTEWATER AND COMMERCIAL WASTEWATER
CHAPTER 101 STORM WATER DRAINAGE UTILITY
CHAPTER 102 ILLICIT DISCHARGE TO STORM SEWER SYSTEM
CHAPTER 105 SOLID WASTE CONTROL AND RECYCLING
CHAPTER 106 COLLECTION OF SOLID WASTE
CHAPTER 107 SOLID WASTE DISPOSAL
CHAPTER 110 NATURAL GAS FRANCHISE
CHAPTER 111 ELECTRIC FRANCHISE
CHAPTER 112 FRANCHISE FEES
CHAPTER 113 CABLE TELEVISION REGULATIONS
CHAPTER 120 LIQUOR LICENSES AND WINE AND BEER PERMITS
CHAPTER 121 CIGARETTE AND TOBACCO PERMITS
CHAPTER 122 PEDDLERS, SOLICITORS AND TRANSIENT MERCHANTS
CHAPTER 123 HOUSE MOVERS
CHAPTER 124 PAWNBROKERS
CHAPTER 125 ADULT ENTERTAINMENT FACILITIES
CHAPTER 126 PUBLIC DANCE HALLS
CHAPTER 135 EXCAVATIONS OF PUBLIC PROPERTY
CHAPTER 136 SIDEWALK REGULATIONS
CHAPTER 137 VACATION AND DISPOSAL OF STREETS
CHAPTER 138 STREET AND SIDEWALK GRADES
CHAPTER 139 NAMING OF STREETS
CHAPTER 140 DRIVEWAY REGULATIONS
CHAPTER 141 FIBER OPTIC CABLE LICENSE
CHAPTER 142 PARKLETS
CHAPTER 150 BUILDING NUMBERING
CHAPTER 151 TREES AND VEGETATION
CHAPTER 152 TEMPORARY STRUCTURES
CHAPTER 153 TEMPORARY SIGNS
CHAPTER 155 BUILDING CODES
CHAPTER 156 PROPERTY MAINTENANCE AND RENTAL HOUSING CODE
CHAPTER 157 STANDARD CONSTRUCTION SPECIFICATIONS
CHAPTER 158 MECHANICAL CODE
CHAPTER 159 PLUMBING CODE
CHAPTER 160 CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL
CHAPTER 161 POST-CONSTRUCTION STORM WATER CONTROL
CHAPTER 162 FUEL GAS CODE
CHAPTER 163 DEMOLITION & RAZE PERMIT
CHAPTER 165 ZONING CODE - GENERAL PROVISIONS
CHAPTER 166 ZONING CODE - DEFINITIONS
CHAPTER 167 ZONING CODE - USE TYPES
CHAPTER 168 ZONING CODE - ZONING DISTRICT REGULATIONS
CHAPTER 169 ZONING CODE - OVERLAY DISTRICTS
CHAPTER 170 ZONING CODE - DEVELOPMENT AND DESIGN STANDARDS
CHAPTER 171 TEMPORARY USES AND STRUCTURES
CHAPTER 172 ZONING CODE - SUPPLEMENTAL SITE DEVELOPMENT REGULATIONS
CHAPTER 173 ZONING CODE - LANDSCAPING AND SCREENING STANDARDS
CHAPTER 174 ZONING CODE - OFF-STREET PARKING
CHAPTER 175 ZONING CODE - SIGN REGULATIONS
CHAPTER 176 ZONING CODE - NONCONFORMING DEVELOPMENT
CHAPTER 177 ZONING CODE - ADMINISTRATION AND PROCEDURES
CHAPTER 178 COMPREHENSIVE PLAN
CHAPTER 179 BOARD OF ADJUSTMENT
CHAPTER 180 CONDITIONAL USE PERMITS
CHAPTER 181 ADMINISTRATION AND ENFORCEMENT
CHAPTER 183 MOBILE FOOD UNITS
CHAPTER 185 FLOODPLAIN MANAGEMENT
96.09 SEWER LATERAL REPAIR/REPLACEMENT.
   1.   Requirements for Sewer Lateral Repair and/or Replacement. The Superintendent shall issue a notice to repair to the property owner when the sewer lateral has conditions which would result in an unacceptable amount of inflow or infiltration to enter the sewer system or which would result in an unacceptable risk of blockages. The Superintendent shall have the sole discretion to determine when repair and/or replacement is required due to unacceptable conditions of a sewer lateral. A sewer lateral shall be considered in compliance with the provisions of this chapter if inspection verifies all of the following conditions to the satisfaction of the Superintendent:
      A.   The sewer lateral is free of roots, deposits of fat, oil and grease (FOG), and/or other solids which may impede or obstruct the flow of sewage.
      B.   There are no illicit or illegal connections to the sewer lateral which would cause inflow, such as roof leaders, sump pumps or yard drains.
      C.   All joints in the sewer lateral are tight and sound to prevent the exfiltration of sewage and/or the infiltration of groundwater.
      D.   The sewer lateral is free of structural defects, cracks, breaks, or missing portions and the grade is reasonably uniform without major sags or offsets.
      E.   The sewer lateral is equipped with cleanouts, if required, as determined by Superintendent.
      F.   The sewer lateral is constructed of materials that are corrosive resistant, nonabsorbent, durable, and with a remaining design life of at least twenty-five years. “Orangeburg pipe,” a bituminized fiber pipe made from layers of wood pulp and pitch pressed together, shall be considered to be at the end of its design life and not compliant with the provisions of this chapter.
      G.   A sewer relief valve, if required, is installed.
      H.   A sewer backwater valve, if required, is installed.
   2.   Owners’ Duty to Make Connection. When any street or alley is ordered to be paved or otherwise permanently improved, it shall be the duty of all owners of property abutting upon such street or alley upon written notice from the City to at once make permanent and substantial connections meeting the conditions listed within this ordinance with sewer, along such street or alley at their own cost and expense. The City shall order such connections made as are necessary, stating generally the location of the street, and the kind and character of connections to be made with the kind of materials to be used, and when the work of making such connections shall be completed.
   3.   Method and Material. The connections made within the street or alley from the mains to and right of way in front of the abutting property and shall be in accordance with the most current version of the Statewide Urban Design and Specifications (SUDAS).
   4.   Method. All the connections shall be made in a thorough and substantial manner under the direction and order of the Superintendent, and in the manner provided by plans or resolution for making connections therewith, so that whenever any such paving is once laid it need not be disturbed for the making of any such connection. No repairs are allowed to be made to “Orangeburg” pipe without the written permission of the Superintendent. When encountered, “Orangeburg” is to be replaced in its entirety of the sewer service.
   5.   Notice to Connect. In case any property owner or title holder fails to make such connections within the time allotted within the provided notice for the improvements of any such street or alley, the Council may order the same and cause the Superintendent to prepare notices to such delinquent property owners to make such connections within 10 days thereafter. The notices shall be mailed by certified mail to the last known address of the property owner or personally served on the property owner. The Superintendent may at his/her option, also publish notice in a newspaper in the City stating the particular lot or lots or parcel of ground in front of which connections shall be made. The publication shall be made as required by law.
   6.   Completion of Work. The City shall include the connections the property owners fail to make within the capital improvement project (CIP).
   7.   Connections Made by City. If any owner of abutting property fails to comply with the provisions of this section by the time stated in the notice to connect, the City may proceed to have such connections made under the supervision and direction of the Superintendent, and keep an accurate account of the expenses incurred.
   8.   Assessment. The City Clerk shall send a statement of the total expense incurred, by certified mail, to the last known address of the property owner who has failed to abide by the notice to connect. If the amount shown on the statement is not paid within 30 days of mailing, the cost and expense of putting in connections by the City as provided herein shall be levied as a special tax against the property abutting or adjacent thereto and the method of estimating, assessing, levying, and collecting the tax shall be the same as that prescribed for general taxes.
   9.   Excavations. After Pavement Laid. Whenever any street or alley has been ordered to be paved, and property owners owning property abutting or lying along such street or alley, have been notified by the City to connect their property by laying down pipes within the right of way in front of or along the property, any person so notified who has refused to comply with the requirements of the notice shall not enter upon such street or alley after it has been paved and make any excavation in the paved portion thereof for the purpose of connecting their property with such mains within 4 years after such paving is laid and not thereafter except by special resolution of the Council.
   10.   Permit Requirements. Property owner shall request permit from the City of Windsor Heights. Permit fees are waived for permits related to CIP.