(a) Item I-14, S.H.D. specifications, shall consist of the construction of a brick, concrete, approved broken concrete, or stone paved gutter and shall be used in all drainage ditches where the grade exceeds two and one-half percent (2-1/2%).
Alternate 1. A storm sewer meeting the approval of the Village Inspector may be constructed by the developer in lieu of the paved gutter.
Alternate 2. In lieu of the above, ditch protection in the form of L-9 seeding and L-10 sodding as described in Section 1115.03 may be provided.
(b) The Planning Commission will not approve any subdivision located in areas subject to periodic flooding, unless the developer or subdivider agrees to perform adequate improvements as will render the area safe from flooding. An additional bond in the amount deemed necessary by the Village Inspector must be provided by the developer or subdivider to guarantee that he will comply with the demands set forth in subsection (a) hereof.
(Ord. 1500. Passed 12-14-99.)