1115.01  SUBMISSION OF PLANS.
   (a)    Prior to the start of any construction, including any houses or streets, the developer shall furnish a plot plan showing the slab or floor elevation of each house proposed to be constructed.  He shall also show by the use of arrows, how he proposes to drain each lot.  In lieu of a plat plan, this information may be shown on the street plan and profile sheets.  All house eave spouts shall be connected with tile to a storm sewer house connection.
   (b)    The developer shall submit on contour maps, or other suitable maps, information relative to the area to be drained, and submit necessary calculations prepared by his registered engineer in determining the proposed water collection system.
(Ord. 1500.  Passed 12-14-99.)