The subgrade shall be constructed to the required depth below the finished surface and shall be thoroughly compacted to a firm smooth surface. All soft spongy matter not affording a suitable subgrade must be removed and replaced with a suitable material and compacted.
(Ord. 2005-7, passed 3-21-05)