Project: By: Date:
Location: Checked Date:
Circle one: Present Developed
Circle one: Tc Tc through subarea
NOTES: Space for as many as two segments per flow type can be used for each worksheet.
Include a map, schematic, or description of flow segments.
Shallow Concentrated Flow Segment ID | |||
7. Surface description (paved or unpaved) | |||
8. Flow length, L ft | |||
9. Watercourse slope, s ft/ft | |||
10. Average velocity, V (See equations, Table 8) ft/s | |||
11. Tt
=L/(3600V) Compute Tt hr
|
Channel Flow Segment ID | |||
12. Cross sectional flow area, a ft2 | |||
13. Wetted perimeter, pw ft | |||
14. Hydraulic radius, r=a/pw Compute r ft | |||
15. Channel slope, s ft/ft | |||
16. Manning's roughness coeff., "n" | |||
17. V = (1.49 r2/3s½)/n Compute V ft/s | |||
18. Flow length, L ft | |||
19. Tt = L/(3600V) Compute Tt hr | |||
20. Watershed or subarea Tc or Tt (add Tt in steps 6, 11 and 19) hr | |||