§ 51.022 SIZE, SLOPE AND ALIGNMENT.
   The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing, and backfilling the trench, shall all conform to the requirements of the current Building and Plumbing Code or other applicable rules and regulations of the city.
(Ord. 2008-1, passed 1-21-08)