§ 54.16 INSTALLATION AND CONNECTION.
   (A)   Where a public sanitary or combined sewer is not available under the provisions of this chapter, the building sewer shall be connected to a private sewage disposal system complying with the provisions of this chapter.
   (B)   Before commencement of construction of a private sewage disposal system, the owner shall first obtain a written permit signed by the Superintendent. A permit and inspection fee of $50 shall be paid to the town at the time the application is filed.
   (C)   A permit for private sewage disposal system shall not become effective until the installation is completed to the satisfaction of the Superintendent. He or she shall be allowed to inspect the work at any stage of construction and, in any event, the applicant for the permit shall notify the Superintendent when the work is ready for final inspection, and before any underground portions are covered. The inspection shall be made within 24 hours of the receipt of notice by the Superintendent.
   (D)   The type, capacities, location and layout of a private sewage disposal system shall comply with all recommendations of the State Board of Health. No permit shall be issued for any private sewage disposal system employing subsurface soil absorption facilities where the area of the lot is less than 20,000 square feet. No septic tank or cesspool shall be permitted to discharge to any natural outlet.
   (E)   At the time as a public sewer becomes available to a property served by a private sewage disposal system as provided, a direct connection shall be made to the public sewer in compliance with this chapter, and any septic tanks, cesspools and similar private sewage disposal facilities shall be abandoned and filled with suitable material.
   (F)   The owner shall operate and maintain the private sewage disposal facilities in a sanitary manner at all times, at no expense to the town.
   (G)   When a public sewer becomes available, the building sewer shall be connected to the sewer within 60 days and the private sewage disposal system shall be cleaned of sludge and filled with clean
bank-run gravel or sand. No statement contained in this chapter shall be construed to interfere with any additional requirements that may be imposed by a county health officer.
   (H)   No unauthorized person shall uncover, make any connections with or opening into, alter or disturb any public sewer or appurtenance thereof without first obtaining a written permit from the Clerk/Treasurer.
   (I)   (1)   There shall be two classes of building sewer permits:
         (a)   For residential and commercial service; and
         (b)   For service to establishments producing industrial wastes.
      (2)   In either case (division (I)(1)(a) or (b) above), the owner or his or her agent shall make application on a special form furnished by the town. The permit application shall be supplemented by any plans, specifications or other information considered pertinent in the judgment of the town. A permit and inspection fees of $50 for a residential or commercial building sewer permit and $100 for an industrial building sewer permit shall be paid to the Clerk/Treasurer at the time the application is filed.
   (J)   All costs and expenses incidental to the installation and connection of the building sewer shall be borne by the owner. The owner shall indemnify the town from any loss or damage that may directly or indirectly be occasioned by the installation of the building sewer.
   (K)   A separate and independent building sewer shall be provided for every building, except where one building stands at the rear of another or an interior lot and no private sewer is available or can be constructed to the rear of the building through an adjoining alley, courtyard or driveway, the building sewer from the front building may be extended to the rear building and the whole considered as one building sewer.
   (L)   Old building sewers may be used in connection with new buildings only when they are found, on examination and test by the Inspector, to meet all requirements of this chapter.
   (M)   The size, slope, alignment, materials of construction of a building sewer and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the building and plumbing code or other applicable rules and regulations of the town. In the absence of code provisions or in amplification thereof, the materials and procedures set forth in appropriate specifications of the A.S.T.M. and W.P.C.F. Manual of Practice No. FD-5 shall apply.
   (N)   The building sewer (lateral) shall be brought to the building below frost level. No sanitary sewage facilities shall be connected to this sewer that are not at an elevation above the top of the casting of the nearest sanitary manhole. Any facilities which are below such level must be connected by means of a lift station or other pumping facilities. No person shall make connection of roof downspouts, exterior foundation drains, areaway drains or other sources of surface run-off or ground water to a building sewer or building drain which in turn is connected directly or indirectly to a public sanitary sewer. Except connection to combined sewers as controlled hereby.
   (O)   The connection of the building sewer into the public sewer shall conform to the requirements of the building and plumbing code or other applicable rules and regulations of the town or the procedures set forth in appropriate specifications of the A.S.T.M. and the W.P.C.F. Manual of Practice No. FD-5. All the connections shall be made gas-tight and water-tight. Any deviation from the prescribed procedures and materials must be approved by the Superintendent before installations.
   (P)   The applicant for the building sewer permit shall notify the Inspector when the building sewer is ready for inspection and connection to the public sewer. The connection shall be made under the supervision of the Inspector or his or her representative.
   (Q)   All excavations for building sewer installation shall be adequately guarded with barricades and lights so as to protect the public from hazard. Streets, sidewalks, parkways and other public property disturbed in the course of the work shall be restored in a manner satisfactory to the town.
   (R)   All extensions of sewers to new developments or unsewered areas of the town shall be sanitary sewers. Construction of new combined sewers or extensions of existing combined sewers are not permitted. All plans and specifications for sewer extensions must have valid construction permits from the State Department of Environmental Management before construction commences.
(Ord. 16 of 2007, passed 12-10-2007)