(a) The design of the water system, storm and sanitary sewerage systems, and roadways, and the grading of the subdivision or development and each lot shall be in accordance with the standards and requirements of Title Five. Drawings and specifications for the improvements shall be reviewed and approved by the City Engineer and the installation shall be subject to the Engineer’s inspections.
(b) At the completion of construction, and before acceptance of the public improvements, the developer shall furnish the City a set of record or “as-built” reproducible drawings showing the locations, sizes, and elevations of all underground utilities.
(Ord. 2006-35. Passed 5-25-06.)