§ 55.084 RECORD DRAWINGS.
   The developer is required to submit record drawings of all permitted stormwater facilities. The record drawings shall be signed and sealed by a professional engineer or professional land surveyor who shall state that the project as constructed is substantially in conformance with the project as permitted. The record drawings shall include calculations verifying that the volumes of detention and compensatory storage required in the permit have been provided.
(Res. 02-441, passed 10-17-2002; Res. 02-495, passed 11-21-2002; Res. 04-87, passed 3-17-2004)