§ 164.045 CONSTRUCTION DEWATERING.
   Water pumped or which is otherwise discharged from the site during construction dewatering shall be filtered, using appropriate sediment and soil erosion control measures, to reduce erosion.
(Ord. 10-164, passed 6-17-2010)