§ 50.048 HAULED WASTEWATER.
   (A)   Septic tank waste may be introduced into the POTW only at locations designated by CW, and at such times as are established by CW. Such waste shall not violate §§ 50.020 et seq. or any other requirements established by CW. CW may require septic tank waste haulers to obtain individual wastewater discharge permits.
   (B)   CW may require haulers of industrial waste to obtain individual wastewater discharge permits. CW also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this chapter.
   (C)   Industrial waste haulers may discharge loads only at locations designated by CW. No load may be discharged without prior consent of CW. CW may collect samples of each hauled load to ensure compliance with applicable standards. CW may require the industrial waste hauler to provide a waste analysis of any load prior to discharge.
   (D)   Industrial waste haulers must provide a waste-tracking form for every load. This form shall include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste. The form shall identify the type of industry, known or suspected waste constituents, and whether any wastes are RCRA hazardous wastes.
(Ord. 653, passed 11-15-21)