(A) After the service line and curb stop have been installed, the city, or its authorized representative, shall inspect the exposed line and turn on the curb stop. Any adjustments that may be required shall be made by the installer.
(B) The curb stop shall not be turned on except for testing purposes until the meter has been installed and work inspected by the Public Works Director, or a representative of the city, and deemed satisfactory and in conformance with all rules. Only authorized city employees shall operate the curb stop unless permission is given by the City Public Works Director prior.
(C) When turning on water at either a new service or an existing service, there must be someone present to make sure there are no leaks.
(D) The owner of a new or existing water service, outside of the city limits, must notify City Hall three days prior to this water service being turned on or off.
(Prior Code, § 51.015)