§ 156.08 CERTIFICATE OF COMPLETION.
   (A)   No work shall be allowed to be done at or on any facility or complex, excepting normal repair and maintenance work as defined in this section, for which the owner cannot produce the COC for the most recent work, until a final inspection has been conducted and a COC has been issued. The owner of the facility, tower or other support structure or complex shall pay for the actual cost of the required final inspection prior to the inspection being conducted. If the facility or complex does not pass the initial final inspection, the owner shall be required to pay for any subsequent inspection prior to the inspection being conducted. A passing final inspection is required prior to the issuance of a COC.
   (B)   If no COC can be produced for previously done work, at the discretion of either the Planning Director or the Building Director, fines and other penalties as allowed by law maybe imposed until the facility or complex is compliant and the required COC has been issued.
(Ord. 2016-4-26-38, passed 4-26-2016)