Whenever a sign becomes structurally unsafe or endangers the safety of a building or the public, the Planning Director or his or her designee shall order that the sign be made safe or removed. A period of ten days following receipt of the order by the person, firm or corporation owning or using the sign shall be allowed for compliance.
(2009 Code, § 155.143) (Ord. passed 10-27-1992; Ord. 2021-Z-19, passed 6-22-2021)