§ 51.03  SEWER SERVICE LINE REQUIREMENTS.
   (A)   Inspections will not be performed on weekends or on legal holidays. The service line will be considered ready for inspection when:
      (1)   The ditch is open and the full length of newly installed pipe is exposed; and
      (2)   Pipe has proper fall and is bedded to one-half its diameter.
   (B)   Backfilling prior to Board’s inspection and approval is strictly prohibited. Violation of this requirement will require excavation of the service line along the full length of new or repaired pipe, to or including the connection to an existing pipe or service line.
(Ord. 921.02(b), passed 9-8-1997)