(A) Any discharge or deposit of a wastewater load for treatment by the City wastewater treatment facility must be authorized by personnel of the City wastewater treatment plant prior to discharge and must be performed pursuant to the procedures and controls established by the City wastewater treatment facility administration.
(B) The City wastewater treatment facility is not required to accept wastewater loads and the wastewater treatment facility has the authority to decline to accept wastewater loads if the City determines that the wastewater treatment facility is not able to adequately or properly treat the wastes or the wastewater load contains toxic or hazardous waste materials or substances, any other item that is potentially dangerous or potentially could adversely affect or be detrimental to the operation of the City wastewater treatment facility. The City wastewater treatment facility controls, with respect to wastewater hauler loads brought to a City wastewater treatment facility, may include, but are not limited to, controls such as limiting the day of delivery, time of day, source of the wastewater, content of the wastewater and number and size of wastewater loads a hauler may discharge at the City facility in a specific time period.
(C) The City wastewater treatment facility may refuse or decline to accept wastewater from any wastewater hauler it determines to have been or is operating in violation of the provisions of this chapter.
(Ord. 369, passed 4-1-2018, § 4.12.030)