909.07  TEST HOLES.
   A street opening permit shall be obtained for any test hole work. No test holes shall be made in or upon a greater surface of the highway than as specified in such permit, and no excavation may interfere with any water pipes, sewers, or drains of the Borough, or any other underground utility service. Test holes shall be promptly backfilled in accordance with provisions set in Section 909.06
(Ord. 3583.  Passed  7-19-10.)