§ 154.23 SIGNING AND RECORDING OF PLAT.
   (A)   Signing of secondary plat.
      (1)   When a bond is required, the Town Council President shall endorse approval on a plat after construction plans have been approved, the bond has been approved, and all conditions of the secondary approval have been satisfied.
      (2)   When installation of improvements is required, the Town Council President shall endorse approval on the plat after construction plans have been approved and all conditions of the secondary approval have been satisfied and all improvements satisfactorily completed. There shall be written evidence that the required public facilities have been installed in a manner satisfactory to the participating jurisdiction, as shown by a certificate signed by the Town Council that the necessary improvements have been accomplished.
   (B)   Recording of secondary plat.
      (1)   Two reproducible Mylar copies of the subdivision plat shall be submitted for signatures by the officials designated herein, plus two paper prints of the subdivision plat. The copies shall be returned to the applicant and his or her engineer or surveyor.
      (2)   In addition to the plat prepared for recording, the applicant shall submit an electronic version of the plat in a form specified by the Design Standards and Specifications Manual. The file shall be submitted at the same time the Mylar is submitted for signature by the Town Council.
   (C)   It shall be the responsibility of the applicant to file the plat with the County Recorder within one year from the date of approval by the Plan Commission. Failure to record the plat within this time frame will result in expiration of the plat approval.
(Ord. 2014-03, passed 5-12-14)