1319.11 FEES FOR DIVISION OF WATER AND SEWER.
   Fees for the Division of Water, including water and sewer rates and tap fees shall be:
   A.   Water Rates (within Village limits)
 
1. Minimum charge for one month or up to 2,000 gallons
$17.14
2. Per 1,000 gallons thereafter
$8.57
   B.   Water Rates (outside Village limits)
 
1. Minimum charge for one month or up to 2,000 gallons
$35.98
2. Per 1,000 gallons thereafter
$17.99
   C.   Monthly Capital Improvement charge per meter by meter size:
 
Meter Size
Charge
5/8" - 3/4"
$2.50
1"
$6.25
1-1/2"
$12.50
4"
$50.00
6"
$82.50
   D.   Sewer Rates (within Village limits)
 
1. Minimum charge for one month or up to 2,000 gallons
$10.92
2. Per 1,000 gallons thereafter
$5.46
3. Minimum charge for one month for those residents not connected to the Village water system
$40.91
   E.   Sewer Rates (outside Village limits).
 
1. Minimum charge for one month up to 2000 gallons for Non-residents with water service
(110% surcharge for outside Village)
$22.92
2. Per 1,000 gallons thereafter
(110% surcharge for outside Village)
$11.46
3. Minimum charge for one month for non-residents not connected to the Village water system
$85.86
   F.   Monthly Capital Improvement charge per meter by meter size:
 
Meter Size
Charge
5/8" - 3/4"
$4.01
1"
$8.53
1-1/2"
$16.03
4"
$61.20
6"
$100.33
   G.   Additional miscellaneous charges:
1. Water shut-off due to non-payment of a bill (first time)
$20.00
(additional shut offs)
$40.00
2. Employee over-time to cover cost of turning water back on if payment is made after 4:00 p.m.
$40.00
3. Deposit for all rental properties before service is turned on
$100.00
4. Replace frozen water meter
Cost of meter plus labor
5. 10% late payment on bills paid after due date
6. Collection fee charged to all delinquent bills if no prior arrangements have been made for payment
$10.00
7. Fee for tampering with meter
$250.00
8. Bulk water, plus cost per gallon
$25.00
9. Damaged service line
Cost of parts plus labor
10. Unauthorized use of hydrant, theft of water
$250.00
11. Bulk water hydrant meter set up (rental fee), plus cost per gallon
$100.00
   H.   Water and sewer tap fees for new construction:
 
1. Sewer tap fee for Village residents
$1,100.00
2. Sewer tap fee for non-Village residents
$2,310.00
3. Water tap fee for Village residents
$1,000.00
4. Water tap fee for non-Village residents
$2,100.00
5. Fireline or fire suppression line
Cost of materials plus inspection.
(Ord. 7-2023. Passed 6-20-23.)