(a) Utility easements five (5) feet in width shall be provided along the rear of each lot and/or along side lot lines where necessary. Such easements shall provide continuous easement to streets or alleys where necessary.
(b) Open ditch easements equal to the width of the required cross-section of such ditch plus twenty (20) feet on one side shall be provided.
(c) Easements for enclosed drainage systems shall be a minimum of fifteen (15) feet in width. (Ord. 10-2016. Passed 12-20-16.)