The following fees are to be levied by the Inspection Department of the city.
(A) Plumbing fees. Permit fees are based on the following fee schedule:
(1) The plumbing permit fee is based on the total project valuation and § 150.45 fee schedule. The project valuation must include the cost of all materials, supplies and labor costs required to install or otherwise complete the plumbing work.
(2) Estimated cost may be reevaluated by the city and additional fees may be required.
(B) Electricity fees. Permit fees are based on the following fee schedule:
(1) The electrical permit fee is based on the total project valuation and § 150.45 fee schedule. The valuation must include the cost of all materials, supplies and labor costs required to install or otherwise complete the electrical work.
(2) Estimated cost may be reevaluated by the city and additional fees may be required.
2014 S-19
(C) Heat, ventilation, air conditioning (HVAC) fees. Permit fees are based on the following fee schedule:
(1) The HVAC permit fee is based on the total project valuation and § 150.45 fee schedule. The valuation must include the cost of all materials, supplies and labor costs required to install or otherwise complete the HVAC work.
(2) Estimated cost may be reevaluated by the city and additional fees may be required.
(Ord. 382, passed 2-21-06; Am. Ord. 461, passed 1-21-14; Am. Ord. 464, passed 3-17-14; Am. Ord. 466, passed 4-21-14)